News  |  Ormazabal supplies MV switchgear for the Gangwon Wind Farm, South Korea.

Ormazabal supplies MV switchgear for the Gangwon Wind Farm, South Korea.

04/12/2009

The Gangwon Wind Farm is right now the biggest Wind Farm installed in South Korea and the East of Asia, with an energy production of 244 Gwh per year. Lahmeyer International GmbH has been involved in this project from its beginning, as owner's engineering, project developer and shareholder and the complete installation in its three phases was completed in October 2006.

Ormazabal supplied the Medium Voltage switchgear from the CGMCOSMOS system, for switching operations and protection of the electrical distribution network.

Download files associated with this piece of news:

.pdfOrmazabal supplies MV switchgear for the Gangwon Wind Farm, South Korea (368.05 kB)English
.pdfOrmazabal suministra Celdas MT para el Parque Eólico de Gangwon, Sur de Corea (368.54 kB)Castellano
 
Grupo Ormazabal
© www.ormazabal.com