Ormazabal's activities in Turkey date back to the early 1990s. The first Ormazabal brand 36kV modular RMU was installed in the METU Rectorship garden and was put into operation by TEDAŞ in 1994. The Ormazabal brand entered the Turkish market with the supply of RMUs for TEDAŞ and Kayseri ve Civarı Elektrik Dağıtım A.Ş. via two different distributors.

Ormazabal started its activities in Turkey with the "Mono-block Concrete Transformer Station" production plant established in Ankara with 100% Spanish capital stock in
1999. Furthermore, marketing, installation and maintenance services for OG Primary and Secondary Switch Systems manufactured in Spain have been supplied in Turkey since 1999. In Turkey, Ormazabal has grown substantially by following the delegation model based on the "living with the customer" principle, which is applied in Spain. Marketing, installation and maintenance activities are provided mainly in Ankara as the centre, in the Istanbul Sales Office, Izmir Sales and Logistics Centre.

There is also a small test laboratory for routine tests at the Izmir Logistics Centre. The Engineering and Commitment group was established in Izmir with a different structure in 2011. In 2012, the relevant group received its first project "Sakarya 2.OSB A.G.-Y.G. Electric Infrastructure, Scada and Counter Automation and Lighting Network Construction Work". With its contribution to the development of the Turkish electric distribution industry for the last twenty years, Ormazabal continues to be the leading brand in the compact/modular RMU market. Today, we are proud of to have Ormazabal brand RMUs or transformer cubicles on nearly every corner in Turkey.

See more

Turkey

Tecnology

Business

1994
First gas-insulated 36kV modular RMU (METU)
1999
The establishment of Ormazabal Elektromekanik San. Tic. A.Ş.
2000
First precast modular concrete station (Goodyear Istanbul)
2000
Opening of precast transformer station factory
2001
First precast underground transformer station (Izmir Kordon)
2002
First self-feeding relay protected vacuum breaker board
2004
Logistics Centre
2006
AG Vertical fuse switch disconnectors (VFSD)
2006
Closing of precast transformer station factory
2010
First GIS type primary switch station (Turguttepe Wind Energy Facility)
2011
Engineering and Project Group